Our
Projects:
- Sludge from the Kality WTP, Addis Ababa (2025)
Energy Fuel (Briquettes & Pellets)
This project focused on the collection and processing of sludge from the Kality Water Treatment Plant in Addis Ababa. Through specialized treatment and pelletization, wastewater sludge was converted into energy-dense pellets and briquettes, transforming a challenging waste stream into a usable renewable fuel while reducing landfill dependency.
- Hamburg, Germany
1.2 MW Bio-Oil CHP Plant
A combined heat and power (CHP) plant utilizing bio-oil derived from lignin extracted from wood waste through a fast pyrolysis process. The facility produces both electricity and heat, showcasing the commercial viability of bio-oil as a renewable alternative to fossil fuels in power generation.
- In Collaboration with Caterpillar USA
Construction of Series 2 “Pyrolyzer” Model
An upgraded Series 2 model of the Pyrolyzer was partially constructed at Caterpillar facilities in Peoria, Illinois (USA), and Hamburg, Germany. This development focused on increasing processing capacity and improving system performance to handle higher volumes of waste and biomass materials for industrial-scale applications.
- Hospital in Ried im Innkreis, Austria
650 kW Jenbacher Biogas CHP & Emergency Power Unit
Installation of a 650 kW Jenbacher biogas engine providing combined heat and power, as well as emergency electricity supply for a hospital facility. The system ensures reliable energy availability while utilizing renewable biogas, supporting both operational resilience and sustainability goals.
Address
Austria
- CO3energy e.U. Hofmark 2 4981 Reichersberg Austria
- +43 677 623 902 00
Malaysia
Ethiopia
Contact
©2026. CO3energy. All Rights Reserved.